Rope Access On 16" Flare Line


A Leading Petrochemical Facility in Southeast Texas has a Carbon Steel NPS 16 Flare Line that needed on-stream, direct inspection due to concerns for corrosion under pipe supports that was identified as part of SEPs (Specialized Emphasis Programs) under their Corporate Asset Integrity Management (AIM) Program.
​
The Flare Line was located on the top level of the intra-unit pipe racks making direct-access challenging. Since there was no way to use conventional lifting methods (i.e. chain falls) and crane usage would have created logistic issues and increased personnel on-site, a solution was developed using rope access and the portable Ovolifts jacks.


A comprehensive work package was developed that allowed the owner to demonstrate that the piping system integrity would be maintained & operational/personnel risk minimized for the duration of the work.
​
Enhanced Safety
Improve safety and production by utilizing rope access inspection crews.
​
-
Rope access eliminates the need for multiple scaffolds.
-
Line lifts hydraulically actuated from safe distance.
-
Line lifting devices are mechanically locked-out to provide safe, temporary supports, allowing safe access.
-
Innovative lifting-devices reduced the need for crane support and minimized applied pipe stress.
​
Schedule Optimization
Efficiency & net-cost savings
-
Project completed 25% ahead of schedule.
-
Reduced equipment footprint and manpower on site, eliminated scaffold and cranes.
-
Off-Site reporting was completed in a timely manner.